Lightweight embankment material - Company Ranking(6 companies in total)
Last Updated: Aggregation Period:Apr 08, 2026〜May 05, 2026
This ranking is based on the number of page views on our site.
Display Company Information
| Company Name | Featured Products | ||
|---|---|---|---|
| Product Image, Product Name, Price Range | overview | Application/Performance example | |
| 【Case Study Contents】 ◎ Maintenance management of buried pipes (bridge maintenance work) ◎ Ground improvement for subsidence mitigation meas... | - Roadbed and embankment on soft ground National Route 9 Bypass Road Interchange Improvement Project Kure City Bridge Maintenance Pr... | ||
|
Super Soil L2 for Civil Engineering: Lightweight Fill Material
10,000 yen-100,000 yen |
【Features】 - Lightweight: 1/5 to 1/7 the weight of ordinary soil - Drainage: Excellent drainage properties - Workability: Easy installation ... | - Roadbed and embankment on soft ground National Route 9 Bypass Road Interchange Improvement Project Kure City Bridge Maintenance Pr... | |
| For more details, please download the PDF or feel free to contact us. | 【Super Soil Applications】 ■ Lightweight fill (soft ground/settlement measures) ■ Backfill for structures (retaining walls/reinforced earth w... | ||
|
---
--- |
--- | ||
-
- Featured Products
-
Glass foam lightweight material and embankment material "Super Sol L2" *Case study collection gift
- overview
- 【Case Study Contents】 ◎ Maintenance management of buried pipes (bridge maintenance work) ◎ Ground improvement for subsidence mitigation meas...
- Application/Performance example
- - Roadbed and embankment on soft ground National Route 9 Bypass Road Interchange Improvement Project Kure City Bridge Maintenance Pr...
Super Soil L2 for Civil Engineering: Lightweight Fill Material
- overview
- 【Features】 - Lightweight: 1/5 to 1/7 the weight of ordinary soil - Drainage: Excellent drainage properties - Workability: Easy installation ...
- Application/Performance example
- - Roadbed and embankment on soft ground National Route 9 Bypass Road Interchange Improvement Project Kure City Bridge Maintenance Pr...
[Disaster Recovery Construction Case] Lightweight Fill Material 'Super Sol' Contributes to Shortening Construction Period
- overview
- For more details, please download the PDF or feel free to contact us.
- Application/Performance example
- 【Super Soil Applications】 ■ Lightweight fill (soft ground/settlement measures) ■ Backfill for structures (retaining walls/reinforced earth w...
-
Membership (free) is required to view all content.
Already a Member? Log In Here
Glass Foam Business Cooperative